Persian
Home | News | Articles | Gallery | FAQ | Contact us | Sitemap | About us
Menu
Geology
Exploration
Geomatics
Chemistry lab
Geology Museum
geological maps
Main Projects
Finance & Official
Publication and Library
Articles
Thesises Index
Environment
Innovation and dehiscence year
uses of Geology
Geotourism
Quarterly Journal Geosciences Index
Geology of Khorassan
mines of Khorasan
book introduction
About us
services and products
Knowledges of Geology
The Eastern sun
Famous geoscientist of Iran
seminars
mashad
Geology and mine laws
Park Museum
Hot Links
Khorassan Geotourism
Khorassan's warm springs
GSINET project
Subsidence in Mashhad plate
Geology Museum
Home » Articles

Articles

Refference : The 25th Symposium on Geoscience;Tehran
Publishing Year : 1385

Abstract :

Determination of ultimate pit limit is one the most important stages of open pit mines planning and design. Pit limit indicates shape and geometry of the mine in the final stage of mining. Having this limit, the amount of mineable ore reserve and required stripping can be defined. Jajarm bauxite mine is situated in Northern Khorasan province. This mine is divided into 12 main blocks in which the Golbini block No. 7 quantitavely and qualitatively has better conditions comparing to the other blocks.
In this paper, with the help of results of previous works including feasibility, rock mechanics and geotechnical studies, Golbini block No. 7 has been designed. Considering maximum recovery, ultimate pit limit was determined with software DATAMINE. On the basis of this study, total amount of mineable ore is 1.58 Mt with average grade for Al2O3 and SiO2, 44.10 and 13.37, respectively. Overall stripping ratio is 11.6:1.


Subject List : mineral potentional

E-mail : info [at] gsinet [dot] ir
Last Update: 2010/09/26
Copyright © 2002-2007 GSINET , All rights reserverd.
P.B. : 91735-1166
18 Str. Sarafrazan Blv. Hour Sq., Mashhad - Iran
Tel: + 98 511 8218146-8 / Fax; +98 511 821 6044