Writers : Ghorbani, M.; Rahnama Rad, J.
Refference : The Forth National Geological Conference of Payam Noor University(PNU)
Publishing Year : 1389
Abstract :
Study penetrate situation the walls of Daroungar dam reservoir & states the karstic degree are aims of this studying. For this reason, after outdoor survey, coring, joint studying, measured the length of core do not recovery done, then for proceed and modeled the water run probability from mass rock of dam reservoir, put the given yield in Dips V.0.5 software. The results showed that, in general dam reservoir is situated on a synclinal structure. The mass rock of the left hand side of dam tectonized very severely and solution phenomenon cause development very much holes. Atamir formation (sand stone with lime cement) has the most dissolvable holes in formations around dam reservoir. As a result of these studies, in the left abutment introduction grout curtain and cement injection for filled up the joints and for right abutment just introduction grout curtain advised.
Subject List :
Dam